During the 1 241 day period from June 26, 2021, availability of bluejaypaint.wordpress.com was checked 1 times. Bluejaypaint.wordpress.com returned a 200 status code on June 26, 2021, marking the 1 time it was operational out of total checks performed. No instances of unavailability for bluejaypaint.wordpress.com were detected during inspections conducted as of November 18, 2024. As of November 18, 2024, it has been reported that all received responses are free from errors. Averaging 0.796 seconds, bluejaypaint.wordpress.com's response time on June 26, 2021, was 0.796 seconds.